Preview our construction and development projects within Southern Ontario. If you have any questions, please contact us
Downtown Loop 3 & Wellington Gateway 1
Brief Description :
These projects were tendered as on contract. Complex full reconstruction in the heart of downtown London. Large diameter watermain, storm sewer and sanitary sewers all replaced. Full road reconstruction to accommodate dedicated centre running bus lanes for the BRT.
Wellington Gateway 3
Brief Description :
Large road reconstruction complete with significant widening, large diameter storm sewer upgrades, dual large diameter watermains as well as CPP watermain replacement. Significant wildlife management required due to the ecologically sensitive area of Ponds mills.
East London Link 1
Brief Description :
Reconstruction of 1.4 kilometres of King St including sanitary sewer, elliptical storm sewer 6m in depth, CPP Watermain, PVC watermain, HDPE chilled water lines and full road reconstruction.
East London Link 2
Brief Description :
New storm, sanitary, watermains, utility infrastructure (including utility poles and aerial plant), street lighting, traffic signals, pavement structure, curb, sidewalk, asphalt paving, bus platforms, streetscaping and landscaping.
East London Link 3A
Brief Description :
Reconstruction in the heart of Old East Village to widen the road to accommodate dedicated bus lanes. Significant utility work including hydro, communications, street lighting and traffic signals.
East London Link 3C
Brief Description :
Full road reconstruction through one of the busiest intersections in the city of London. Significant large diameter watermain, sanitary and storm sewers. Overhead hydro relocation and trenchless casing installation for watermain and hydro duct banks to accommodate future bridge widening.
Wellington Gateway Clarkâs Bridge
Brief Description :
Continuation of our phase 1 contract. Complete with deep, large diameter sewers, bridge rehabilitation and widening to accommodate 2 dedicated bus lanes.