York Street – Sewer Seperation Phase 1

Reconstruction of York Street in downtown London including extensive removal and installation of updated Storm sewers, Sanitary Sewers and water main. Removed over 100-year-old infrastructure while installing up to 1350mm concrete storm pipe, 525mm concrete sanitary and 450mm watermain. Featured extensive traffic control to maintain pedestrian and vehicle traffic through the downtown core. Included installation of over 2400 square meters of sidewalk and 5000 tonnes of asphalt.

Comments are closed.