Kitchener Waste Water Treatment Plant

  • 2015 $6,925,000.00
  • Regional Municipality of Waterloo
  • Graham Construction and Engineering

Waste Water Treatment Plant. Installed all Yard Piping including 2700mm diameter concrete pressure pipe. Also performed all excavation and grading required on site.

SW Trunk Sewer and Wonderland Road

  • 2015 $8,190,000.00
  • City of London
  • AECOM

Installation of 900 meters of Concrete Sanitary Sewer Pipe, ranging from 1650mm diameter to 900mm diameter, at over 9 meters in depth on Wonderland Road. Installation of 1250 meters of 900mm diameter Concrete Sanitary Sewer Pipe, and 700 meters of 200mm PVC pipe on Hamlyn Drive. Also included installation of 300 meters of Storm Sewer and 800 meters of Watermain Installation. Complete restoration of Wonderland Rd and Hamlyn Dr including